Your browser does not support JavaScript I want to

REPORT
FIND
Contact Info and Maps
News and Entertainment
APPLY FOR
Documents
Permits/Jobs
Services/Assistance
PAY/BUY
SCHEDULE
FILE
City of Akron

The City of Akron will be constructing comprehensive roadway improvements on East Exchange Street between the limits of Broadway and Fountain Street beginning in 2023. Project improvements will include full depth asphalt pavement, providing two travel lanes for vehicular traffic in each direction and center turn lanes (total five lane section), plus bike lanes in each direction, and parking in key locations.  In addition, new traffic signals will be installed along with upgraded lighting and other utilities.   

As a key corridor in the city and within the campus of the University of Akron, East Exchange Street is poised for proper investment to better facilitate economic growth, increased walkability and overall pedestrian safety. Proper investments in paving, sidewalks, consistent cross sections and lighting will better meet the needs of the increasingly bustling corridor that is often full of students, professors and local professionals. 

The City’s ultimate goal is to provide a consistent, safe roadway for all users, vehicles, buses, bicycles, and pedestrians, further spurring private economic investment in the area.

General questions, comments, or concerns may be emailed to [email protected] or mailed to:

Akron Engineering Bureau
166 South High Street
Design Division Room 701
Akron, Ohio 44308
Attn:  Christine Jonke P.E.

Full Press Release 

Summary 

Location Map with Aerial View 

Section Limits

Striping Plan 

Top Requests
and Concerns


Mayor Don  Plusquellic

Search | Sitemap | Terms of Use | Privacy Policy | Careers | Contact Us

© 2016 City of Akron. All Rights Reserved.


This page was printed from the City of Akron Web site
Visit us online at www.http://www.akronohio.gov
© 2015 City of Akron. All Rights Reserved.