Your browser does not support JavaScript I want to

REPORT
FIND
Contact Info and Maps
News and Entertainment
APPLY FOR
Documents
Permits/Jobs
Services/Assistance
PAY/BUY
SCHEDULE
FILE
City of Akron

The City of Akron as well as the Summit County Dept of Building Standards will review all project being constructed with in the City of Akron.

Required at time of Submittal

  1. City of Akron Right-of-Way Application
  2. Copy of Providers (Utility Company) Certificate of Registration
  3. Full complete set of plans
    1. Civil Plans
      1. Show proposed work
      2. Show Right-of-Way lines and anything on private property within 50’ of the Right-of-Way
      3. All utilities within 100’ of installation
      4. Show areas of restoration
    2. Storm Water Pollution Prevention Plan
      1. Silt fence as needed
      2. Inlet protection
      3. Concrete washout location
  4. Contact information of the party responsible for  invoiced for review fees

Can be submitted separate from initial submittal

  1. Summit Soil and Water Conservation District Approval

The following types of plans will not be accepted

  1. Aerial photos with proposed work drawn overtop
  2. Hand drawn plans that are not clear or not drawn without drafting tools

Required prior to issuance of Permits

  1. Performance Bond
    1. Will need to be in the amount of estimated cost of the proposed Right-of-Way restoration or $10,000, whichever is larger
  2. City of Akron Contractor Registration
  3. List of any Sub-Contractors that will be working on the project
  4. Contact information of the party responsible for invoiced fees

Top Requests
and Concerns


Mayor Don  Plusquellic

Search | Sitemap | Terms of Use | Privacy Policy | Careers | Contact Us

© 2016 City of Akron. All Rights Reserved.


This page was printed from the City of Akron Web site
Visit us online at www.http://www.akronohio.gov
© 2015 City of Akron. All Rights Reserved.