Your browser does not support JavaScript I want to

REPORT
FIND
Contact Info and Maps
News and Entertainment
APPLY FOR
Documents
Permits/Jobs
Services/Assistance
PAY/BUY
SCHEDULE
FILE
City of Akron

 

This Design Build project (Project) will consist of the final design and construction of a new complete street corridor along South Main Street between the general limits of State Street and Mill Street. Full roadway improvements are proposed including pavement, drainage structures, water main, steam, curb, sidewalk, decorative and/or landscape buffers, parallel parking, LED lighting and cycle track. Vehicle lanes will be aligned consistently with turn lanes at the primary intersections. Bump outs are proposed to better define parking areas and provide better pedestrian crossings. New traffic signals are proposed including interconnect and video detection. The intersection of Mill Street and Main Street will be converted to a roundabout. In addition the Project will include the removal and reconstruction of State Street Bridge between South Main Street and Water Street. The new structure will carry a two lane facility on the north and a pedestrian/bicycle deck on the south side of the structure.

Top Requests
and Concerns


Mayor Don  Plusquellic

Search | Sitemap | Terms of Use | Privacy Policy | Careers | Contact Us

© 2016 City of Akron. All Rights Reserved.


This page was printed from the City of Akron Web site
Visit us online at www.http://www.akronohio.gov
© 2015 City of Akron. All Rights Reserved.