Industrial Pretreatment
Program
The core mission of this program is: |
"To prevent
interference, pass through,
and sludge contamination,
while meeting regulatory requirements" |
| The major end results of this program are: |
- Compliance with NPDES Permit Industrial Pretreatment Program
requirements,
- Enforcement of federal, state and local pretreatment program
requirements, and
- Prevention of pass through, interference, inhibition and
sludge contamination in regard to the Akron Water Pollution
Control Station.
|
Combined Sewer
Overflow (CSO) Program
The major end results of this program are: |
- Verification that CSOs occurred only as a result of wet
weather,
- Compliance with technology based requirements and State
established Water Quality Standards,
- Minimization of impacts on water quality with respect to
human health, aquatic and biotic criteria, and
- Compliance with NPDES Permit CSO requirements and US EPA
strategies.
|
Stormwater Program
The major end results of this program are: |
- Reduction of the discharge of pollutants from the municipal
separate storm sewer systems (MS4),
- Implementation of the MS4 NPDES Permit and,
- Implementation of non-point source objectives.
|
Tributary Community
Permit Program
The major end results of this program are: |
- NPDES Permit Compliance with respect to Tributary
Communitys.
- Reduction of inflow and infiltration and,
- Elimination of Separate Sanitary Sewer Overflows (SSOs) with
respect to the Communitys sanitary sewers tributary to the Water Pollution Control
Station.
|